Results for: requirements for pickleball court in HOA to be approved by FHA ... Showing 361 to 370 of 1569
- 361.
Zero Action Plan approved in March 2016. The City of Fremont is a mid-sized city, population 240,000, located in the Silicon Valley area of Northern California. During the three years from 2013 to 2105, Fremont experienced a concerning rise in traffic fatalities and severe injury crashes, particularly involving pedestrians, youth, and seniors. The attention
https://www.ite.org/ITEORG/assets/File/Awards/2021 Winners/web TAA Safety_Fremon...
- 362.
Needed ITE Staff Approval & ITE Forms Technical Conference Savolainen March 15 ? 3 N/A Webinar 1 Ryan May 15 ? 1 Broom Webinar 2 Ryan May 15 ? 1 Broom Webinar 3 Ryan December 31 ? 1 Broom Webinar 4 Ryan December 31 ? 1 Broom Faculty Advisor Manual Content Savolainen June 30 ? Student Chapter Manual Content Savolainen June 30 ? Student Chapter Tracking Sheet
https://www.ite.org/ITEORG/assets/File/AA Published on Site/Council and Committe...
- 363.
Approval, such as green-colored pavement for bicycle lanes, red-colored pavement for transit lanes, and a groundbreaking traffic signal warrant based on crash experience. ITE specifically commends FHWA for recognizing the pivotal role of uniform traffic control devices in fostering safety across the roadway network, aligning with the principles of the Safe
https://www.ite.org/ITEORG/assets/File/Media/ITE Response to MUTCD 11th Edition_...
- 364.
Oregon in the 1990s that addressed all modes of travel that was approved at local, regional, and state levels. With involvement at the Section, District, and International levels of ITE for more than 40 years, Randy has served in numerous leadership positions since his first Chair position for the San Francisco Bay Area Section in 1984. Before being elected
https://www.ite.org/ITEORG/assets/File/Randy McCourt.pdf
- 365.
He is thoroughly familiar with the latest capabilities and requirements available and expected from cities and municipal governments. For more than 35 years, Rock has been a consultant at the senior or principal level in the field of traffic engineering, traffic safety, and circulation design. ITE ― A C ommunity of T ransportation Professionals 1627 Eye
https://www.ite.org/ITEORG/assets/File/Media/2025 Honorary Members PR_final.pdf
- 366.
Provides funding to local communities dealing with PFAS contamination in the drinking water and requires EPA identify and assist these and other communities with effective decontamination techniques. Clean Energy— $34.3 Billion o Invests in electric grid modernization to accommodate more renewable energy and to make the grid more secure, resilient and
https://www.ite.org/ITEORG/assets/File/Advocacy Committee/2020 Moving Forward Fa...
- 367.
Transportation (USDOT), documents in the CTI family may be approved and published by any of SDOs mentioned but are developed and maintained by representatives across the connected vehicle spectrum. The documents in the CTI family include standards and technical reports that provide guidance to develop and maintain an interoperable connected vehicle
https://www.ite.org/technical-resources/topics/standards/cav-cti-standards/
- 368.
Kinnard initiated the discussion on the INBUS feature, which was voted and approved for removal by the previous WG. Options considered were: 1. leave, denote as optional functionality 2. leave, note as deprecated functionality, existing equipment only, not for new designs 3. remove all references, mark pins as reserved • P.Skweres MOTION1 to reverse
https://www.ite.org/ITEORG/assets/File/Standards/ATC_5301_Std_MinWGTelecon_21101...
- 369.
College in Gresham—required cooperation from multiple local governments and transportation agencies in addition to TriMet and DKS Associates. For many years, Division Street was a two-lane street near the inner-city end that widened to a four (and then five lane) avenue further from the center of Portland. It has been a dangerous road for decades: along
https://www.ite.org/ITEORG/assets/File/Awards/2023/TAA TSMO_ DIVISION TRANSIT PR...
- 370.
Develop a Systems Requirements Specification (SyRS) update with new system requirements that trace to the new user needs focused on ... design elements that race to the new system requirements focused on Signal Priority and Preemption 345 days ... and validation activities to verify that the system requirements are achievable and appropriate and validate that the
https://www.ite.org/ITEORG/assets/File/CI Phase 2 Project Schedule - 230930.pdf