Step No.
|
SDO Process Step
|
Deliverables
|
Status
|
Start Date
|
Completion Date
|
14
|
SDOs maintain the Standard
|
|
|
|
|
13
|
SDOs approve the Recommended Standard and thereby create the Standard |
|
|
|
|
12
|
JC forwards Recommended Standard to SDOs |
NOTE: In response to the comments received during the balloting process the Errata sheet is now provided. There were no changes made to the content of the documents related to the approval of TMDD v3.03c.
Previously posted documents provided for reference only
NOTE: Based on comments from the development of the Reference Implementation, some minor changes were made to the Needs to Requirements Traceability Matrix in TMDD Volume I. There was no changes to the user needs or design content, and a redundant requirement was removed. These changes are documented in TMDD v3.03c.
PROVIDED for reference only – NOT to be used for Implementation
|
Complete |
|
7/16/14 |
11
|
JC votes on submission of Recommended Standard to SDOs |
|
Complete |
|
3-Sep-13 |
10
|
WG prepares Draft Recommended Standard |
|
Complete |
|
8-Aug-13 |
9
|
WG decides to submit a "resolved" version as a Recommended Standard |
These actions were overcome by events leading to the version 3.03a noted above |
N / A |
|
22-Jul-13 |
8
|
WG resolves user comments |
N / A |
|
26-Jun-13 |
7
|
JC distributes UCD through SDOs and receives comments |
N / A |
|
9-May-13 |
6
|
JC votes on distribution of UCD |
N / A |
|
26-Apr-13 |
5
|
WG prepares User Comment Draft (UCD) |
|
Complete |
12-Nov-13 |
15-Mar-13 |
4
|
WG develops WG Draft for informal review |
|
Complete |
15-Mar-12 |
20-Sep-12 |
3
|
JC forms a WG |
|
N / A |
|
|
2
|
JC (Joint Committee) votes to form WG (Working Group) |
|
N / A |
|
|
1
|
Submit request and initiate standards activity |
|
|
|
|