Tracking TMDD v3.03 by the SDO Process

Tracking TMDD v3.03 by the SDO Process

(For complete details on the steps of the Standards Development Process please click here.)

Step No.
SDO Process Step
Deliverables
Status
Start Date
Completion Date
14
SDOs maintain the Standard
 
     
13
SDOs approve the Recommended Standard and thereby create the Standard      
12
JC forwards Recommended Standard to SDOs NOTE: In response to the comments received during the balloting process the Errata sheet is now provided. There were no changes made to the content of the documents related to the approval of TMDD v3.03c.

Previously posted documents provided for reference only

NOTE: Based on comments from the development of the Reference Implementation, some minor changes were made to the Needs to Requirements Traceability Matrix in TMDD Volume I.  There was no changes to the user needs or design content, and a redundant requirement was removed.  These changes are documented in TMDD v3.03c. 

PROVIDED for reference only – NOT to be used for Implementation

Complete   7/16/14
11
JC votes on submission of Recommended Standard to SDOs Complete   3-Sep-13
10
WG prepares Draft Recommended Standard Complete   8-Aug-13
9
WG decides to submit a "resolved" version as a Recommended Standard These actions were overcome by events leading to the version 3.03a noted above N / A   22-Jul-13
8
WG resolves user comments N / A   26-Jun-13
7
JC distributes UCD through SDOs and receives comments N / A   9-May-13
6
JC votes on distribution of UCD N / A   26-Apr-13
5
WG prepares User Comment Draft (UCD) Complete 12-Nov-13 15-Mar-13
4
WG develops WG Draft for informal review   Complete 15-Mar-12 20-Sep-12
3
JC forms a WG   N / A    
2
JC (Joint Committee) votes to form WG (Working Group)   N / A    
1
Submit request and initiate standards activity        

 

Tracking TMDD v3.03 by the Project Plan

Step No.
Project Plan
Deliverables
Step Status
Start Date
Completion Date
12
Approved Standard      
11
Notice of Intent to Adopt Draft NOTE: In response to the comments received during the balloting process the Errata sheet is now provided. There were no changes made to the content of the documents related to the approval of TMDD v3.03c.

Previously posted documents provided for reference only

NOTE: Based on comments from the development of the Reference Implementation, some minor changes were made to the Needs to Requirements Traceability Matrix in TMDD Volume I.  There was no changes to the user needs or design content, and a redundant requirement was removed.  These changes are documented in TMDD v3.03c. 

PROVIDED for reference only – NOT to be used for Implementation

    7/16/14
10
Draft Standard for Ballot      
9
User Comment Draft Comment Resolution        
UCD Comment and Resolution Draft Summary  
8
User Comment Draft Standard  Complete 15-Mar-12 15-Mar-13
7
Design  Content - Committee Working Draft 3   N/A    
6
Design Content - Committee Working Draft 2   N/A    
5
 
Design Content - Committee Working Draft 1   N/A    
4
 
Standards Requirements Specifications   N/A    
3
 
Concept of operations – User Needs   N/A    
2
 
Systems Engineering Management Plan   N/A    
1
Project Management Plan   N/A